Engineering Change Order (ECO) Coordinator/Drafter II Job at FEI-Zyfer, Garden Grove, CA

dVE0RGd0cTRMRDFldU9yVEo5VysvZVR5dFE9PQ==
  • FEI-Zyfer
  • Garden Grove, CA

Job Description

Brief Description of Job Duties:

Under limited supervision, perform standard drafting assignments based on work orders provided. Make adjustments in drawings or specifications. Prepare working plans, detailed drawings, and complete mechanical or electrical drawings for components and assemblies. Works from notes, verbal instructions, and rough or detailed sketches for engineering or manufacturing purposes. Verify completed work and check dimensions, materials to be used, and quantities.

Primary duties include, but are not limited to:  

  • Engineering Change Control Coordinator - Manage engineering changes (ECO) through the approval and release cycle using an online system. Duties also include chairing the weekly Change Control Board (CCB) meeting.
  • Drafting duties - Create Assemblies and Fabrication drawings (light to medium complexity) using SolidWorks and AutoCAD software.
  • Check drawings and BOM’s for correctness
  • Perform other duties as assigned. 

JOB REQUIREMENTS

The applicant MUST have the following qualifications:

  • High School Diploma or equivalent (GED) combined with relevant on-the-job experience.
  • 3 to 5 years of experience in a CAD drafting environment using PLM systems.
  • 3 to 5 years of experience creating assembly drawings, fabrication drawings, Bills of Materials (BOM), and Engineering Change Orders (ECO).
  • 3 to 5 years of experience in CAD drafting environment working to the drafting room standard manual.
  • 3 to 5 years of experience working with 3D CAD drafting tools
  • Excellent oral and written communication skills with the ability to collaborate effectively with engineers, the manufacturing team, and cross-functional stakeholders.
  • U.S. citizenship is required.

Mental Qualifications:

  • Ability to interpret and visualize complex technical drawings and blueprints.
  • Strong attention to detail and spatial reasoning skills.
  • Proficient in problem-solving and critical thinking.
  • Capable of managing multiple projects and meeting deadlines.
  • Comfortable working independently and collaboratively with engineers.
  • Competency in using CAD software and other design tools.

Physical Qualifications:

  • Ability to sit at a desk or workstation for extended periods.
  • Manual dexterity sufficient for operating computer equipment and drafting tools.
  • Clear vision (with or without corrective lenses) for close-up design and reading technical documents.
  • Occasionally, may be required to walk through our manufacturing environment.


Additional Desirable Experience:

  • Strong organizational skills and attention to detail, ensuring accuracy, consistency, and efficiency in both computer-based and administrative tasks.
  • Experience using AutoCAD software to create, modify, and maintain technical drawings and engineering documentation.
  • Familiarity with Arena PLM/Empower systems for managing product lifecycle data, engineering changes, and documentation.
  • Knowledge of IPC standards and their application to engineering drawings, documentation, and manufacturing processes.
  • Experience working in a drafting room environment with an understanding of drafting standards, procedures, and best practices.

 

Please note this job description is not designed to cover or contain a comprehensive listing of activities, duties or responsibilities that are required of the employee for this job. Duties, responsibilities, and activities may change at any time with or without notice.

*Placement in pay range depends on: years of relevant CAD drafting experience, 3D drafting tools experience, any of the additional desirable experiences such as knowledge of IPC standards, etc.

 

Compensation details: 65000-75000 Yearly Salary

PId350a7399955-30492-40869616

Job Tags

Full time

Similar Jobs

Biddle Company Logistics LLC

DELIVERY DRIVER - AMAZON PACKAGES Job at Biddle Company Logistics LLC

 ...Amazon DSP Package Delivery Driver Biddle Company Logistics LLC 24800 Miles Rd, Bedford, OH 44146, USA Full-time Job Type: Permanent Compensation: $21.75 - hourly Company Description Biddle Company Logistics LLC is an Amazon Delivery Service Partner... 

ColumbiaCare Services

On Call Residential Care Associate I - 5802 Job at ColumbiaCare Services

APPLY TODAY AND MAKE A DIFFERENCE IN THE MENTAL HEALTH FIELD! What We Offer Enjoy our many benefits and incentives including: Affordable Medical/Dental/Vision plansFlexible Spending AccountGenerous Paid Time OffWhole Health & Wellness Reimbursement ProgramProfessional...

Oneleet

Technical Content Writer Job at Oneleet

 ...reads like it was written by someone who has actually done the work, because you have. - Turn internal knowledge and founder rants...  ...or the appetite to get sharp on it fast. - Comfortable working remotely, EST time zone.NICE-TO-HAVE - Experience writing about SOC... 

Henkel Corporation

Production Operator 3rd Shift (Brandon, ... Job at Henkel Corporation

 ...specifications, engineering change orders (ECOs), and standard work procedures in a safe operating manner. When in doubt, stops and asks Shift Coordinator or Manager for assistance. Ensures that all required quality testing gets completed within product specification and... 

Greater Lynn Senior Services

Meals on Wheels Driver - Temporary Job at Greater Lynn Senior Services

Join the GLSS Team and make a difference every day!GLSS is looking for talented and caring individuals to join our team.Benefits: GLSS embraces the need for our Employees to have work-life balance and offers a generous benefits package that starts on your date of hire! ...